Welcome To The Home Of The Visual FoxPro Experts  
home. signup. forum. archives. search. google. articles. downloads. faq. members. weblogs. file info. rss.
 From: Pavel Pipiska
  Where is Pavel Pipiska?
 Prievidza
 Slovakia
 Pavel Pipiska
 Tags
Subject: Change order at grid
Thread ID: 388 Message ID: 388 # Views: 8 # Ratings: 0
Version: Unknown Category: General VFP Topics
Date: Saturday, May 26, 2001 5:20:07 AM         
   


I have grid with 5 columns and table with 5 indexes. At each header.click I have code for change index : set orde to T1 (T2,T3,....)
thisform.grid1.refresh
When I click at header of column index is set OK, also is changed recno. But I need that recno be always the same.

Thanks, Paul

ENTIRE THREAD

Change order at grid Posted by Pavel Pipiska @ 5/26/2001 5:20:07 AM
RE: Change order at grid Posted by John Zylstra @ 5/26/2001 6:32:44 AM
RE: Change order at grid Posted by Pavel Pipiska @ 5/28/2001 7:40:17 AM
RE: Change order at grid Posted by Ryss Unger @ 5/28/2001 2:06:56 PM
RE: Change order at grid Posted by Pavel Pipiska @ 5/29/2001 3:44:46 AM
RE: Change order at grid Posted by Ryss Unger @ 5/29/2001 12:26:14 PM
RE: Change order at grid Posted by Ryss Unger @ 5/30/2001 1:16:08 PM